External Safety Officer | Steelworks | 2018 - 2019 |
External Safety Officer | FAS (Large-sized tubes factory) | 2017 - 2020 |
Works Manager - Safety Coordinator during project and execution phases | Cooling towers replacement - Steelworks | Dalmine S.p.A. | 2020 |
Works Manager - Safety Coordinator during project and execution phases | Asbestos removal from roof - Building MAT C | Dalmine S.p.A. | 2020 |
Works Manager - Safety Coordinator during project and execution phases | Ferrè furnace revamping - FTM | Dalmine S.p.A. | 2020 |
Works Manager - Safety Coordinator during project and execution phases | Rotary furnace revamping - FTM | Dalmine S.p.A. | 2020 |
Works Manager - Safety Coordinator during project and execution phases | Expander smokestack revamping | Dalmine S.p.A. | 2020 |
Works Manager - Safety Coordinator during project and execution phases | Final calibrator change | Dalmine S.p.A. | 2019 |
Works Manager - Safety Coordinator during project and execution phases | New EMI installation and testing Phase I | Dalmine S.p.A. | 2019 |
Works Manager - Safety Coordinator during project and execution phases | Overhead crane replacement | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | Fire-fighting system realization - Director building | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | Steelworks roof restructuring | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | “Buca FTM” parking pipes restructuring | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | Erection and commissioning of the new heat treatment plant | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | Dismantlement of sandblasting line and relocation of the grinding machine line | Dalmine S.p.A. | 2018 |
Works Manager - Safety Coordinator during project and execution phases | Assembly of the new sandblasting line | Dalmine S.p.A. | 2017 |
Works Manager - Safety Coordinator during project and execution phases | Assembly of the new grinding machine line | Dalmine S.p.A. | 2017 |
Works Manager - Safety Coordinator during project and execution phases | Erection of new structural steel elements to reinforce the existing building | Dalmine S.p.A. | 2017 |
Works Manager - Safety Coordinator during project and execution phases | Dismantlement of IGF furnace | Dalmine S.p.A. | 2017 |
Compliance with Annex V - D.Lgs. 81/08 | Size range extension of the rolling mill drilling machine | 2020 |
Compliance with Annex V - D.Lgs. 81/08 | Steel continuous casting line CCO1 | 2020 |
CE Marking | Robotic station Tenaris University | 2019 |
Compliance with Annex V - D.Lgs. 81/08 | Maintenance stations of rolling mill MPM cages, ejector, calibrator | 2019 |
CE Marking | Non-destructive ultrasonic monitoring machine Olympus | 2019 |
Compliance with Annex V - D.Lgs. 81/08 | Metal shelving | 2019 |
CE Marking | Crane 9 FTM | 2019 |
CE Marking | New ladela station | 2019 |
Compliance with Annex V - D.Lgs. 81/08 | Overhead crane TRT2 | 2018 |
CE Marking | Non-destructive electromagnetic-field monitoring machine TALOS | 2018 |
CE Marking | Non-destructive electromagnetic-field monitoring machine GYGES | 2018 |
CE Marking | New 28'' EMI | 2018 |
Compliance with Annex V - D.Lgs. 81/08 | Flag crane LF2 | 2018 |
Compliance with Annex V - D.Lgs. 81/08 | Lathe | 2018 |
Compliance with Annex V - D.Lgs. 81/08 | Equipment for maintenance of rolling mill cages | 2018 |
Compliance with Annex V - D.Lgs. 81/08 | Heating furnace EXPANDER inlet line | 2018 |
CE Marking | Sandblasting line for internal pipes | 2018 |
CE Marking | Sandblasting line for external pipes | 2018 |
CE Marking | Pipe heat treatment and straightening line TRT2 | 2018 |
CE Marking | Laser measuring machine - IMS | 2018 |
CE Marking | Pipes non-destructive ultrasonic monitoring line | 2018 |
Compliance with Annex V - D.Lgs. 81/08 | Machine tools (milling machines, stonemasons, grinders, lathes) | 2017 |
Compliance with Annex V - D.Lgs. 81/08 | Ingot moulds turning equipment | 2017 |
Compliance with Annex V - D.Lgs. 81/08 | Trolley for wooden planks | 2017 |
Compliance with Annex V - D.Lgs. 81/08 | Scrap park equipment (Buckets, baskets, magnets, platforms, octopuses) | 2017 |
Compliance with Annex V - D.Lgs. 81/08 | Steel continuous casting machine CCO1 | 2016 |
CE Marking | Boron treatment plant | 2016 |
Compliance with Annex V - D.Lgs. 81/08 | Pipe cutter Bronx | 2015 |
Electromagnetic fields assessment | Non-destructive electromagnetic-field monitoring line EMI | 2020 |
Manual handling risk assessment | Accessory Center OCTG | 2019 |
Artificial optical radiation risk assessment | Nassheuer furnace and TRT2 | 2019 |
Microclimate risk assessment | FAS (Large-sized tubes factory) | 2018 |
Microclimate risk assessment | FTM (Medium-sized tubes factory) | 2018 |
Noise risk assessment | TRT2 (Heat treatment line) | 2018 |
Lighting assessment | SUCH (Supply Chain) | 2018 |
Lighting assessment | FAS - Offices - Quality - OCTG | 2018 |
Microclimate risk assessment | Steelworks | 2017 |
Microclimate risk assessment | FAS (Large-sized tubes factory) e FTM (Medium-sized tubes factory) | 2017 |
Manual handling risk assessment | FTM (Medium-sized tubes factory) | 2016 |
Manual handling risk assessment | OCTG | 2016 |
Take-over, technical drawing and structural analysis | Dimensioning of mechanical buffer of overhead crane runway | 2020 |
Take-over, technical drawing and structural analysis | Trailer for test weights | 2019 |
Take-over, technical drawing and structural analysis | Trailer for bars | 2019 |
Take-over, technical drawing and structural analysis | Shuttle | 2019 |
Take-over, technical drawing and structural analysis | Guillotine cylinder chain | 2018 |
Take-over, technical drawing and structural analysis | Sliding gate | 2018 |
Take-over, technical drawing and structural analysis | Ladle manipulator | 2017 |
Pro Safe – Società Tra Professionisti S.p.A.
Via Guido Galimberti 6
24124 Bergamo – Italy
VAT N. 04090100167
Share Capital 50.000 € i.v.
T +39 035 2817808
info@pro-safe.it
ProSafe HSE Engineering S.r.l.
Aleea Liliacului nr. 27
Jud. Salaj, Mun. Zalău – Romania
C.I.F.: RO41378047
© ProSafe – Engineering, Safety and Certification in Bergamo